Termination / Determination in Construction Contracts

Sr Jaspal Singh, HRDC Accredited Trainer

Certificates

For Attendance

Available for

35 Seats

20 CIDB CDD

Applied

6 BQSM CPD

Applied

Include Notes

Meals Provided

More Information

03-410 681 92

Email

info.arhcentrum@yahoo.com

Course Detail

Termination is one of the most high-stakes — and most misunderstood — actions in any construction contract, and this two-day intensive tackled it head-on. Sr Jaspal Singh walked a packed room through the full lifecycle of termination and breach: from employer- and contractor-initiated termination to termination for convenience, unpacking the contract clauses, legal remedies, and financial defaults that determine whether a termination stands up or backfires. With real procedures for handling contractor default and the damages that follow a wrongful termination, this was as much about risk protection as it was about legal literacy.

Participants left with a clear, practical framework for recognising when — and how — to terminate a contract without exposing their organisation to costly disputes.

Course Outline

Day 1

Type & Feature of Termination

Introduction to Termination & Breach of Contract

Termination by Employer (Contract Default)

Termination by Contractor & Financial Defaults

Day 2

Termination by Convenience

Contract and Legal Clauses & Legal Remedies

Damages & Consequences of Termination

Procedures for Contractor Defaults